The WPSubscription
Changelog
2.5.2
LatestFree Plugin Kept Up to Date
Installing or updating WPSubscription Pro now installs or updates the free WPSubscription plugin automatically, so the two always work together.
Subscription Activity Times
Times in the activity list on the admin subscription page now show in your site's local time instead of being shifted forward.
No Second Charge After a Failed Early Renewal
A failed early renewal no longer schedules a payment retry that charges the customer again while the early renewal order is still open.
2.5.1
Plan Options After Updating Pro First
Product pages showed no plan options when Pro was updated to 2.5.0 before WPSubscription. Pro now keeps showing them as a fallback.
2.5.0
Subscription Boxes
Sell several products on one subscription: let customers build their own box, send a box you hand-pick, or publish a new edition every month, all from one Boxes screen.
Read the announcement
Box Builder on the Product Page
Customers fill their box on the product page and watch the price update, and what is inside shows in the cart, orders and emails.
Box Pricing and Discount Tiers
Charge one price per box or add up what is picked, reward bigger boxes with bigger discounts, and set sizes from an exact number to "at least N" with no limit.

Box Items from Products, Categories or the Whole Shop
Choose a box's items product by product, by category or from the whole shop, give each box its own durations, and plan monthly editions in collapsible cards.

Add to a Box and Frequently Bought Together
Customers can add a product to a box from its own page, add extras to their next delivery, include items that ship only in the first box, and see what is often boxed together.
Box Changes, Skips and Pick List
Subscribers can swap items or skip their next box from My Account and get an email before each box ships, and you get an Upcoming list and a pick list for packing.
Custom CSS for Purchase Options
Style the purchase options on your product pages with your own CSS from Settings > Product page.
PayPal Hidden for Changing Box Prices
PayPal is not offered for boxes whose price can change, so checkout always goes smoothly.
Plans Use the New Purchase Options
Your plans now use the new, better-looking WPSubscription purchase options, which need WPSubscription 2.5.0.
Early Renewal and Payment Retry Failure Reasons
When an early renewal or a payment retry fails, the subscription history and the WooCommerce log now say why.
Box Tabs and Rules by Type
A box's screen shows only the tabs and rules that apply to its type, and the cart no longer shows a curated box as "3 of 4".
Installment Plan Tax and Final Payment
Pay-in-installments plans no longer charge tax twice on renewal and stop after their own last payment, and catalog prices show each installment's cadence and count.
Stripe Express Checkout on Boxes Without a Price
The Stripe Express Checkout button is hidden on a box that has no price yet, which stops a JavaScript error on the product page.
2.4.0
Multilingual Customer Notifications
Renewal reminder, payment failure and recovery emails are sent in the language the customer bought in, and the rest of the plugin is translatable.
Early Renewal Order Conflicts and Payment Link
Early renewal is no longer blocked by orders from other subscriptions or by a deleted early renewal order, and a customer with an unpaid renewal order is shown a link to pay it.
Regenerate API Key Button
The Regenerate API key button on the Settings screen now works.
2.3.0
Flat-Amount Cancellation Retention Coupons
Cancellation retention offers can now create flat-amount coupons in the store currency in addition to percentage discounts.
Early Renew Button Visibility Rules
Configure rules to show the Early Renew button always, a set number of days before payment, from a day of the month, or by percentage of cycle remaining.
Direct Payment Checkout on Early Renewal
Early Renew takes the customer straight to the payment page.
Plan Checkout with Signup Fee and Free Trial
Plans with a signup fee and a free trial charged only the signup fee. Checkout now charges the first payment with the fee, and the trial no longer applies to those plans.
Default Cancellation for New Plan Subscriptions
New plan subscriptions let customers cancel by default.
2.2.0
License Key Renewal Options
Option to issue a new license key on each renewal, and to deactivate the previous key.
Copy Button for License Keys
Copy button for license keys on the customer's subscription page.
Early Renewal License Key Generation
Early renewals no longer generate a second license key.
Empty License Keys Section
Renewal orders and emails no longer show an empty license keys section.
2.1.0
Mixed Cart
Enables customers to purchase subscription products and one-time items together in a single checkout session.
Undefined Function Error
Fixed a fatal error caused by calling an undefined function under certain WordPress and WooCommerce configurations.
2.0.0
Plans Support for Subscribe & Save and Split Payment Types
Added full subscription plan support for Subscribe & Save discounts and Split Payment installment types across catalog products.
Read the announcementConnect Plans to Variable Products
Enables store owners to link reusable subscription plans directly to WooCommerce variable products and individual variations.
Cancellation Retention Offers with a Real Coupon
Present targeted retention offers with automated WooCommerce coupon generation to prevent churn during the cancellation flow.
Cancellation Reports
Introduces detailed cancellation analytics and reporting to track churn reasons, survey responses, and retention campaign outcomes.
Trial Card Collection
Collects and validates payment card details upfront for free trials to ensure seamless automatic billing at trial expiration.
License Page with Status and Help
Added a dedicated license management screen displaying key status, expiration dates, activation count, and quick help links.
Consistent Admin Page Headers
Standardized page headers, breadcrumbs, and action button layouts across all Pro admin settings and report screens.
1.18.6
PHP Compatibility Issue
Resolved PHP compatibility issues and strict type warnings on modern PHP 8.1+ environments to ensure smooth and error-free operation.
1.18.5
Notify Store Owner When a Customer Cancels a Subscription
Store owners now receive an automatic email notification as soon as a customer cancels a subscription, enabling timely churn tracking and follow-up.
Email Templates
Updated subscription email templates with refreshed styling, cleaner layouts, and reliable placeholder parsing across all automated notices.
Guest Account Creation
Fixed account provisioning during guest checkout so customer accounts and subscription records link seamlessly upon completing a purchase.
Guest Checkout Error
Resolved a validation error during guest checkout that previously blocked guest customers from completing recurring subscription orders.
1.18.4
Discounted Amount Was Not Showing Properly
Fixed discounted subscription price calculations across cart, checkout, and order summaries so promotional discounts and coupons display accurately.
API Settings Were Not Saving
Fixed an issue in the admin dashboard where REST API credentials and webhook configuration settings failed to persist upon saving.
1.18.3
Variation Split Payment Price Total in Checkout
Improved the checkout split payment calculation for product variations. Customers will now see the correct split payment total according to their selected variation.

1.18.2
Add to Cart Validation For Variable Products
Add to cart check fixed for variable subscription products. Invalid or incomplete variation selection no longer bypasses validation or adds a broken product to cart.
Admin Table Pagination
Pagination fixed on admin subscription tables. Page numbers and record counts are now correct; no more stuck, skipped, or duplicate rows across pages.
Early Renewal Tax Issue
Tax calculation fixed for early renewal payments. Early renewal now charges the correct tax amount matching normal renewal, instead of a miscalculated total.
1.18.1
Subscription Cancellation Feedback
Short survey now shown in cancellation flow. Customer picks reason (too expensive, missing features, found alternative, no longer needed, other) before subscription cancels. Reason saved on subscription record, gives store owner data to act on churn.
Read the announcement
Customize Subscription Cancellation Behavior
Store owner can now control what happens on cancel. Configure whether cancellation is immediate or runs to the end of the paid period, and set other cancel flow rules, instead of fixed default behavior.

1.18.0
Subscription Switch (Upgrade/Downgrade)
Customers can now switch plans themselves. Change between subscription variations or tiers, upgrade or downgrade, right from the account dashboard. Billing and schedule adjust automatically on switch.

Subscription Details Activities
Activity log on subscription details fixed. Events like renewal, cancel, upgrade, and pause now log and display correctly and in right order.
Retry Renewal
Renewal retry logic fixed. Failed renewal payment now retries as configured, instead of failing silently or skipping retry attempt.
Chart.js Asset Loading
Chart.js asset loading hardened. Script now loads from a safe, verified source with correct enqueue handling, reducing risk tied to asset loading.
1.17.2
Retry Subscription Payment from Subscription Health
Retry action from Subscription Health screen fixed. Triggering retry payment directly from health dashboard now correctly reattempts charge on subscription.
Moved Settings to the Free Version
Relevant settings relocated to free version. Base configuration options now available without Pro, cleaner separation between free and Pro settings screens.
1.17.1
Delivery Schedules UI
New dedicated screen for delivery scheduling. Set and manage delivery dates for recurring product subscriptions, including a sync schedule option, in one place instead of scattered settings.
Reports UI
New reporting dashboard added. Shows subscriptions this month, revenue, subscriber count, and churn rate at a glance, pulled from the store's own subscription data.
Health UI
New Subscription Health screen added. Dedicated dashboard for monitoring at-risk and overdue subscriptions, with filtering and bulk actions.
Mollie Mandate Error for Renewals
Mollie mandate error fixed. Renewal charge no longer fails due to invalid or missing mandate reference; renewals process correctly through Mollie.
1.17.0
Subscription Health
Subscription Health now surfaces overdue or failed renewals and at-risk subscribers, shows revenue at risk, and runs automatically in the background.
Read the announcement
Subscription Payment Failed Tracking
Failed payment tracking fixed. Failed renewal attempts now correctly recorded and reflected in subscription and payment history.
1.16.4
Same Subscription Quantity
Qty edge case fixed. Subscribing to the same product twice (or updating qty) no longer creates mismatched/duplicate subscription records. Cart, checkout, and renewal now keep qty in sync with order.
Payment Failed Email Template
Failed payment email template fixed. Broken placeholders and formatting corrected. Customer now gets clear, correctly rendered notice on failed renewal, with right amount, product, retry, or update payment info.
1.16.3
Mollie Gateway not Processing Renewal Payments Automatically
Auto renewal via Mollie fixed. Recurring charge on due date failed silently in some setups. Renewals now trigger and process correctly through Mollie, same as Stripe or PayPal.
Error Caused by Some Integration Hooks Returning Null
Null return crash fixed. Certain hooks used by third-party integrations returned null instead of the expected value, throwing fatal or PHP errors. Hooks now guard against null, preventing site-breaking errors.
Language-Based File Project ID Version
Translation file versioning fixed. Language or POT file Project ID Version string corrected. Ensures translation tools like Loco or WPML match the right plugin version, avoiding outdated or mismatched string loads.
1.16.2
Action Hooks from the Free Version
Action hooks restored in the free version. Hooks needed by integrations and custom code now fire correctly again in free version, not just Pro.
WP Security Updates
Core files updated for the latest WordPress security patches. Plugin now aligned with current WordPress security standards, closing outdated code paths.
1.16.1
Role-Based Feature Settings
Store owner can now restrict or assign features by user role. Control which roles get access to specific subscription features or content on active subscription.

1.16.0
MailPoet Integration
Direct integration with MailPoet added. Subscribers can now sync to MailPoet lists automatically based on subscription status, for newsletter and automation flows.
AutomatorWP Integration
AutomatorWP triggers and actions added for subscriptions. Build automation recipes off subscription events like signup, renewal, cancel, without custom code.
Variable Product Added to Cart with Direct Link Error
Direct add-to-cart link for variable subscription product fixed. Product no longer added with wrong or missing variation when linked directly.
Subscription Timing Inconsistencies
Subscription date and timing calculation fixed. Renewal, trial, and expiry dates now line up consistently across the subscription lifecycle.
1.15.0
Recurring Coupons
Coupons can now apply repeatedly across renewals, not just first order. Discount keeps applying each billing cycle as configured.

Ability to Enable/Disable Quick Details QR
Toggle added for Quick Details QR feature. Store owner can turn QR display on or off per need, instead of it always showing.
Ability to Enable/Disable Subscription Switching
Toggle added for subscription switching. Store owner can turn upgrade/downgrade switching on or off store-wide.
Subscription Switching Issue
Switching bug fixed. Upgrade/downgrade between plans now processes correctly without leaving subscription in wrong state.
Split Payment Options were not Showing
Split payment option display fixed. Installment/split pay choice now shows correctly on product and checkout when enabled.
1.14.2
Show Total Amount of the Split Payments in Cart
Cart now shows total split payment amount. Customer sees full installment total alongside per-payment amount before checkout.

Tutor LMS Locking Other Non-Subscription-Related Courses
Tutor LMS access bug fixed. Subscription-based locking no longer restricts unrelated, non-subscription courses.
Cart Showing Incorrect TAX
Cart tax calculation fixed. Correct tax is now shown and applied for subscription products in cart.
WC Session Check Error
WooCommerce session check error fixed. Session validation no longer throws error during cart/checkout flow.
1.14.1
Add to Cart Error
General add-to-cart error fixed. Subscription product now adds to cart reliably without error interrupting flow.
1.14.0
Fluent CRM Integration
Direct integration with Fluent CRM added. Subscriber data syncs to Fluent CRM based on subscription status for targeted email automation.
Read the announcement
Split Pay Cart Description
Split payment description text in cart fixed. Correct wording now shown explaining installment terms to customer.
Signup Fees Rounding Down
Signup fee rounding fixed. Fee amount now calculates and displays without incorrect rounding down.
Stripe Helper Not Found Issue
Stripe helper class error fixed. Missing/undefined helper no longer causes an error during Stripe checkout or renewal.
1.13.0
WPFusion Integration
Direct integration with WPFusion added. Subscription status can now sync tags/data to WPFusion for CRM and automation use.
1.12.2
Variable Prices were Not Showing VAT
VAT display fixed for variable subscription prices. Price shown now correctly includes VAT, same as simple products.
Subscription Details Default Endpoint
Default endpoint for subscription details page fixed. Correct account page endpoint now loads by default.
WordPress Tested up to Version
Plugin's "Tested up to" version updated. Confirms compatibility with the latest WordPress core release.
Other Minor Bugs
Several small bugs fixed across the plugin. General stability and consistency improvements, no major behavior change.
1.12.1
Custom User Subscription Endpoints
Custom endpoints added for user subscription pages. Store owner can configure account page endpoint slugs for subscription areas.
Missing Translations From Checkout Page
Missing checkout page strings fixed. All checkout text now available for translation, none skipped.
1.12.0
Mollie Gateway Support
Mollie added as a supported payment gateway. Subscriptions can now bill and renew automatically through Mollie.
Razorpay Gateway Support
Razorpay added as a supported payment gateway. Subscriptions can now bill and renew automatically through Razorpay.
Xendit Gateway Support
Xendit added as a supported payment gateway. Subscriptions can now be billed and renewed automatically through Xendit.
Core Subscription Timing Translations
Core timing strings (day/week/month/year labels) fixed for translation. Now translate correctly instead of showing default English.
Auto Complete Orders
Auto-complete order behavior fixed. Subscription orders now mark complete correctly per configured setting, instead of getting stuck.
1.11.0
Hide Selected Payment Gateways from Subscription Checkout
Store owner can now hide specific payment gateways from showing on subscription checkout. Let's store limit checkout to only gateways that support subscription billing.
1.10.0
LearnDash Integration
Direct integration with LearnDash added. Course access can now be tied to active subscription status.
LearnPress Integration
LearnPress now supported. Tie course enrollment to subscription status; access follows plan active or expired.
Settings Page
Settings page layout and organization improved. Options grouped more clearly, easier to find and configure.
Made Settings Modular and can be Added From Anywhere
Settings framework refactored to modular structure. New settings fields can now be registered from any add-on or integration without touching core files.
1.9.1
Auto Complete Processing Orders
Subscription orders in processing status can now auto-complete based on settings, reducing manual order management.
Nonce Security Issues
Nonce verification fixed across relevant actions. Requests are now properly checked, closing a gap around unauthorized action submission.
Type Casting Errors
Type casting errors fixed. Values now cast to the correct type before use, preventing PHP warnings/errors from mismatched types.
1.9.0
Tutors LMS Integration
Direct integration with Tutor LMS added. Course access can now be tied to active subscription status.
Nonce Security Issues
Additional nonce verification gaps fixed. Further actions are now properly validated against unauthorized requests.
1.8.1
Output Escaping Security Issues
Output escaping fixed across affected areas. Data now properly escaped before rendering, reducing XSS risk.
1.8.0
Quick Subscription Check QR Code
QR code added for quick subscription status check. Scan to verify subscription details without logging into admin.
WPSoftware License Integration
Direct integration with WPSoftwareLicense added. Licenses can now be tied to subscription status for software/license selling.
License ManagerWoo User End (Frontend) Fatal Error
Frontend fatal error fixed for License Manager for WooCommerce integration. Account page license display no longer crashes.
1.7.1
Error Due to Operation with Wrong Type
Type mismatch error fixed. Operation now checks value type before processing, preventing fatal error.
1.7.0
Subscription Upgrade
Customers can now upgrade subscription plan directly, in addition to existing downgrade support.
Control Product/Variation Visibility Based on User Role
Store owner can now show or hide specific products/variations depending on the customer's user role.
Auto Renewal On/Off Action Visibility (For Stripe Paid Subscriptions Only)
Auto renewal toggle visibility fixed. Toggle now shows only for Stripe paid subscriptions as intended, not other gateways.
1.6.0
Subscription Grace Period
Grace period setting added. Subscription stays active for set extra days after failed renewal before suspension, giving the customer time to fix payment.
Show License From License Manager for WooCommerce Plugin in Subscription Details (Admin & User)
License key from License Manager for WooCommerce is now shown directly in subscription details, both admin and customer account view.
Subscription Product Input Form Not Showing Issue
Subscription product input fields fixed. Form now displays correctly on product edit screen.
Settings Page
Further settings page refinements. Layout, grouping, and clarity improved further.
1.5.0
License Manager for WooCommerce Integration
Direct integration with License Manager for WooCommerce added. License generation and delivery tied to subscription lifecycle.
Updated Language Template Files
Language template (.pot) files updated. Includes latest translatable strings for accurate translations.
1.4.0
Print Delivery Schedules List
Delivery schedules list can now be printed directly. Useful for offline fulfillment or physical delivery tracking.

Subscription, Delivery Schedules, Filters
Filters on subscription and delivery schedules screens fixed. Filtering now returns correct, matching results.
1.3.3
Stripe iDeal Integration
iDeal added as supported payment method under Stripe. Customers can subscribe and renew using iDeal.
Stripe SEPA Integration
SEPA Direct Debit added as a supported payment method under Stripe. Customers can subscribe and renew using SEPA.
1.3.2
Added Renewal Reminder Emails
Renewal reminder email added. Customer notified ahead of upcoming renewal charge, reducing failed payments and surprise charges.
Added Language Base File
Base .pot language file added to plugin. Enables translators to create new language files from scratch.
1.3.1
Free Version Install Prompt Error
Free version install prompt fixed. Prompt to install/activate free version no longer errors out.
1.3.0
Split Payment Feature Added
Split payment option added. Customers can now pay for a subscription product in installments instead of one full charge upfront.
Read the announcementPayment Retry Mechanism
Automatic retry added for failed payments. Failed renewal or installment charge now retries per configured schedule instead of failing permanently on first attempt.
Read the announcementWooCommerce High- Performance Order Storage (HPOS0 Compatibility
Plugin now compatible with WooCommerce HPOS. Subscriptions work correctly on stores using new high-performance order storage, alongside legacy post-based storage.
1.2.1
Fixed Delivery Date Bug
Delivery date calculation fixed. Scheduled delivery date now generates correctly for recurring delivery products.
Missing Lang Support Added
Missing translation strings added. Previously untranslatable text now available for translation.
Fixed Naming Fetal Error
Naming conflict fatal error fixed. Corrected function/class name clash that was crashing site in certain setups.
1.2.0
Hooks and Actions Added to Enhance Subscription Workflows
New action hooks added across the subscription lifecycle. Developers can hook into more events for custom workflows and integrations.
REST API Support to Manage Subscriptions
REST API added for subscriptions. Manage subscription data and actions programmatically outside wp-admin.
Refreshed Stats Page For Easier Insights and Tracking
Stats page redesigned. Clearer layout for tracking subscription performance and revenue at a glance.
Events for Trial Ending, Subscription Expiry, and Payment Failures
New event triggers added for trial ending, subscription expiry, and payment failure. Enables automations and notifications tied to these moments.
Filter Options on the Subscriptions List Page to Manage More Easily
Filters added to the subscriptions list. Narrow list by status, gateway, or other criteria for faster management.
Bulk Actions Available on the Delivery Schedule Page for Better Control
Bulk actions added to the subscriptions list. Apply status change or other action across multiple subscriptions at once.
Filters Added to the Delivery Schedule Page for Better Control
Filters added to the delivery schedule page. Narrow scheduled deliveries by date, product, or status.
Dedicated Page Added to Guide You on Setting Up Payment Integrations
New setup guide page added for payment gateway integrations. Walks store owners through configuring each supported gateway.
Language Support Across the Plugin
Translation coverage improved plugin-wide. More strings are translatable, and existing translations are more consistent.
Quick Access to Documentation with a New Getting- Started Video Link
Getting-started video link added for quick documentation access. Easier onboarding directly from plugin screen.
1.1.0
Admin Interface Overhaul
Admin interface redesigned. Cleaner layout and navigation across subscription management screens.
UI and Support for Core Plugin
UI improved and support extended for Core (free) plugin. Better consistency and usability for free version users.
1.0.1
Initial Release of the Pro Version with Advanced Features and Premium Support
Pro version launched. Adds advanced subscription features and premium support on top of the free version.
1.0.0
Initial Release
First release of the plugin. Core subscription and recurring payment functionality for WooCommerce.
Pro releases reach license holders through automatic updates.
See Pro pricing